“In some areas of research there were also significant time savings. You get to what you are looking for more quickly, which all goes to the value of the product.”
Harper McleodAccess all documents on Building Regulations
This Checklist sets out essential steps for arbitrators to consider when deploying artificial intelligence (‘AI’) tools, or where AI is involved in arbitral proceedings. Given the fast‑moving nature of the technology and the applicable laws and regulations, please be aware that this is not a comprehensive list and should be treated as such. The Checklist is intended to provide guidance on best practice. Understanding AI Key points Notes Definition of AI Artificial intelligence refers to computer systems’ capacity to exhibit human‑like cognitive functions, such as decision‑making, planning, reasoning and knowledge representation. IBM characterises AI as technology that allows computers and machines to emulate human learning, understanding, problem‑solving, decision‑making, creativity and autonomy. WIPO portrays AI as a branch of computer science focused on building machines and systems capable of performing tasks thought to require human intelligence. Machine learning and deep learning are two branches within AI. In recent years, with advances in neural network methods and hardware, AI is commonly regarded as...
This Checklist sets out the trigger points and timescales for serving a landlord’s certificate and a former landlord’s certificate under the Building Safety Act 2022 (BSA 2022), together with the consequences of failing to meet the relevant statutory duties. For full guidance, see Practice Notes: Building Safety Act 2022—landlord’s certificate Building Safety Act 2022—landlord and tenant issues In England, the prescribed requirements for landlord’s certificates are contained in the Building Safety (Leaseholder Protections) (England) Regulations 2022, SI 2022/711, regs 1 and 6, as amended from 5 August 2023 by the Building Safety (Leaseholder Protections etc) (England) (Amendment) Regulations 2023, SI 2023/895, regs 10, 11 and 13. All references to SI 2022/711 are, accordingly, to those regulations as amended. Trigger events and timing Has the current landlord (as described in SI 2022/711, reg 1(3) as the ‘person who is the landlord under a lease of premises in a relevant building’) implemented a process to ensure a landlord’s certificate is supplied...
During any due diligence, a purchaser should establish whether an energy performance certificate (EPC) and a recommendation report are required, and then confirm that a valid EPC has been provided. In a multi-let building, several EPCs may be needed for different parts of the property. An EPC allows the buyer to assess the building’s energy efficiency. It sets out a rating that can be benchmarked against the average for comparable stock. A poor score may negatively affect the property’s value. A recommendation report must accompany the EPC unless there is no reasonable potential to improve performance against the energy standards currently in force. However, owners are not legally obliged to follow the recommendations. See our Overviews: Energy performance certificates and minimum energy efficiency requirements (MEES)—overview and Energy and renewable apparatus in buildings—overview, and our Practice Notes: Energy performance certificates (EPCs)—what are they and when are they required? and Energy performance certificates (EPCs)—issues for commercial landlords and tenants. Do the Energy Performance of Buildings (England and Wales) Regulations...
No content was provided between the START and END markers. Please supply the text you want rewritten (including any subheadings), and I will return it in HTML with UK spellings, the same messaging, tone and length, using varied phrasing and the required ellipses...
In this issue: Energy efficiency and buildings Energy for environmental lawyers Environmental enforcement and prosecutions ESG and sustainability Hazardous substances and chemicals Nature, biodiversity and habitat conservation Waste Waste producer responsibility regimes Water, flooding and drainage Daily and weekly news alerts New and updated content Latest Q&A Energy efficiency and buildings The Department for Energy Security and Net Zero (DESNZ) has issued its 2025 post‑implementation review (PIR) of the Energy Savings Opportunity Scheme (ESOS) Regulations 2014 (SI 2014/1643). Using Phase 3 compliance notifications from the Environment Agency, together with unpublished interim data from Phase 3 action plans, and building on the 2020 PIR, it recommends holding off any major amendments to the ESOS Regulations until a full evaluation ends in May 2026, after which a comprehensive PIR will be completed. The research evaluates how energy audits and reporting identify and deliver energy efficiency savings across organisations. See: LNB News 14/08/2025 6...
In this issue Construction industry news Fire safety Standard form construction contracts Planning for construction lawyers Daily and weekly news alerts New and updated content New Q&As Construction industry news In this article, we reflect on the principal shifts in construction law that surfaced during the closing months of 2024, and consider what might unfold in 2025. See News Analysis: Construction law—key developments in 2024, and what to expect in 2025. Fire safety The MHCLG has issued revised editions of Approved Document B (fire safety) for both volume 1 (dwellings) and volume 2 (buildings other than dwellings). These updates consolidate the 2019 editions together with the 2020 and 2022 amendments, and also include upcoming changes planned for 2025, 2026 and 2029...
In this issue: Adjudication Building safety Planning Litigation Construction industry news Daily and weekly news alerts New and updated content Construction trackers Adjudication Contractual interpretation in adjudication disputes (Dawnvale v Hylgar) In Dawnvale Cafe Components Ltd v Hylgar Properties Ltd [2024] EWHC 1199 (TCC), the court reviewed the reach of a Tomlin Order/Settlement Agreement concluded after settling enforcement of an adjudicator’s decision, and assessed whether its wording barred a proposed second adjudication. It also had to determine if that proposed reference raised a dispute already resolved by the first adjudication. This ruling underlines the need for exact drafting in settlement agreements and the prospect of further claims where matters are not expressly concluded. Written by Michael O’Connor, partner at Charles Russell Speechly LLP. See News Analysis: Contractual interpretation in adjudication disputes (Dawnvale v Hylgar). Building safety Building liability orders: court gives guidance on procedures in first reported case (Wilmott Dixon v Prater) ...
National policy 25-Year Environment Plan —the 25-Year Environment Plan outlines the government’s commitments to enhance the environment within a generation. The Environmental Improvement Plan 2023 (EIP 2023) for England was the first statutory update to the 25-Year Environment Plan under the Environment Act 2021 (EA 2021). On 1 December 2025, it was replaced by the Environmental Improvement Plan 2025 (EIP 2025), now the current environmental improvement plan for EA 2021 purposes. EIP 2025 renews the long-term framework for achieving environmental outcomes, revises the interim targets in EIP 2023 and adds two new interim targets. EIP 2025 is pertinent to waste planning as part of the broader policy to improve resource efficiency and drive the move to a more circular economy, complementing the Resources and Waste Strategy and the Waste Management Plan for England (see below). Resources and Waste Strategy The Resources and Waste Strategy sets out how the government intends to conserve material resources by cutting waste, promoting resource efficiency and moving towards a circular economy in...
Why are construction products regulated? Construction products are regulated to: confirm that any item entering the market meets all legal obligations, and build trust among consumers, public authorities and manufacturers regarding product conformity What sort of products are affected? ‘Construction product’ means any product or kit manufactured and placed on the market for permanent incorporation in construction works, or their parts, where its performance affects how those works satisfy the basic requirements. This includes items such as doors, windows, shutters and gates, membranes, thermal insulation, chimneys and flues, sanitary appliances, fire alarms, flooring, fire-retardant products, space heating appliances, power cables, glass, fixings, and many others. Key definitions Placing on the market ‘Placing on the market’ is the first time a construction product is made available on the GB market, as described in UK government guidance. Making available on the market ‘Making available on the market’ means any supply of a construction product for distribution or use...
Embedding sustainability This Practice Note considers supply chain sustainability through the wider lens of sustainable procurement and environmental, social and governance (ESG) performance, concentrating on leading themes in UK and EU private sector practice. It offers practical direction on setting up a supplier code of conduct and building a comprehensive supply chain sustainability programme that addresses: Human rights and labour standards Environmental impacts and deforestation Corruption and litigation exposure Risk management across the supply chain Public procurement sits outside the scope of this note. For further information on supply chain sustainability in the UK, including details on UK regulations, see Practice Note: Supply chain sustainability—UK. For further information on supply chain sustainability in the EU, including details on EU regulations, see Practice Note: Supply chain sustainability—EU. For further information on sustainable public procurement in the UK, see Practice Note: A guide to sustainable public procurement. Supply chain sustainability has moved from the margins to a central business priority. Although...
The Contract comprises the completed Standard Building Contract With Approximate Quantities 2016 published by the JCT subject to the following amendments: This Contract adopts JCT SBC/AQ 2016 with extensive modifications to reflect design responsibility, building safety and commercial controls. Recitals: Contractor to provide a master programme and Schedule of Information Requirements; confirms site due diligence and accepts full CDP design liability. Articles: Dutyholder Regulations added; Tender Price covers Principal Contractor duties; arbitration removed; Schedule of Amendments prevails; strict protection of Third Party Agreements. Definitions/governance: new and revised terms (Building Safety Regulator, HRB, Practical Completion, Copyright Material, Design Sub‑contractors, Dutyholder Regulations); several deletions; English court jurisdiction. Design/materials/information: skill‑and‑care design and coordination; only new, compliant, non‑deleterious materials; golden thread storage; monthly programme reporting; site risks at Contractor’s risk. Procedures/controls: tighter instruction, testing, defects and as‑built duties; enhanced confidentiality and IP licences; HRB assistance; CDM/Dutyholder competency confirmations. Sub‑contracting/rights: prescribed sub‑contracts, insurances and delivery of collateral warranties/third‑party rights; limits on assignment. Payment/commercial: 28‑day final...
Claim Number: [ insert number ] IN THE HIGH COURT OF JUSTICE KING'S BENCH DIVISION Claim for Fatal Mesothelioma BETWEEN: [ name of Claimant ] Claimant (acting as Personal Representative of the estate of [ insert name ], Deceased) -and- B COMPANY LTD Defendant PARTICULARS OF CLAIM The claimant The claimant is the widow of [ name ] and serves as the personal representative of that estate (‘the deceased’). The claimant issues this claim for the estate under the Law Reform (Miscellaneous Provisions) Act 1934, and for herself, as the deceased’s dependant widow, under the Fatal Accidents Act 1976...
Date [ date ] Parties [ name of Landlord ], [ of OR incorporated in England and Wales (company registration number [ number ]) ], whose registered office is at [ address ] [ together with an address for service in England and Wales at [ address ] ] (the Landlord); [ name of Tenant ], [ of OR incorporated in England and Wales (company registration number [ number ]) ], with its registered office at [ address ] [ and an address for service in England and Wales at [ address ] ] (the Tenant); [ [ name of Guarantor ], [ of OR incorporated in England and Wales (company registration number [ number ]) ], having its registered office at [ address ] [ and an address for service in England and Wales at [ address ] ] (the Guarantor) ]...
Given the timescales, the matters at hand give rise to questions requiring careful evaluation of factual circumstances and professional judgement. The grant of planning permission and the issue of a building regulations completion certificate confirm that the requisite approvals were secured in 1996, after due consultation with the relevant authorities, at which point the siting of the sewer would have been taken into account...
Regulation 12(6) of the Building Regulations 2010 (the 2010 Regulations), SI 2010/2214 (SI 2010/2214, reg 12(6)) Regulation 12(6) removes the need for a building notice or full plans where the works are solely those in Schedule 3 (by the corresponding registrant) or in Schedule 4. Schedule 3 includes door replacements: 10: Replacement of a window, rooflight, roof window or door in an existing dwelling—by BM Trada Certification Limited; CERTASS Limited; Certsure LLP; Fensa Limited (Fenestration Self-Assessment Scheme); NAPIT Registration Limited; Network VEKA Limited; or Stroma Certification Limited. 11: The same in a non-dwelling—excluding load-bearing or structural glass, glazed curtain walling and revolving doors—by BM Trada Certification Limited; CERTASS Limited; Certsure LLP; Fensa Limited (Fenestration Self-Assessment Scheme); or Stroma Certification Limited. Schedule 4, paragraph 1(h) covers replacing an external door where the door plus frame has not more than 50% of its internal face area glazed. If the door falls within Schedule 4, paragraph 1(h), no notice or plans are needed....
This Q&A explores whether a gas safety certificate is necessary before issuing a section 21 notice, in situations where the flat has no gas appliance installed at all whatsoever...