Key definition
Schedule of services definition

What does Schedule of services mean? In practice, a schedule of services is the part of a consultant’s appointment or a pre‑construction services agreement (PCSA) that itemises, in detail, the services the consultant or (at PCSA stage) the contractor must provide for the project. The term is not defined by legislation or case law; it is a descriptive expression used across construction and professional appointments and is commonly capitalised in standard forms (for example, RIBA, ACE, NEC and JCT), where it forms part of the contract documents. A schedule of services typically sets out the scope of services and deliverables, level of design, programme...

Read More Right Arrow

M&E Engineer Appointment—Schedule of Services for Design and Build (RIBA Stages 0–7; pre- and post-novation; optional Lead Consultant and CDM Principal Designer duties)

Precedents
imgtext

Schedule of services—M&E Engineer (Design and build Procurement)

The Consultant shall:

General responsibilities (Stages 0–7)

  • Lead and co‑ordinate the Design Team, integrate discipline designs, chair design meetings, manage stage reports, and facilitate Client–team communications.
  • Act as Principal Designer under CDM 2015 and the Building Regulations 2010, or liaise with the appointed Principal Designer to secure safe design practice.
  • Receive Client/Contractor instructions around novation, align deliverables with cost, prepare/review drawings and specifications, and maintain a deliverables schedule.
  • Ensure full design co‑ordination, resolve carry‑over items each stage, advise on Client CDM duties, and collaborate with the BIM Manager.

Pre‑novation (Stages 0–4)

  • Undertake site appraisals, risk and viability advice, desk studies, and surveys; develop the brief and responsibility matrix; support cost planning and BIM decisions.
  • Formulate options, outline proposals and utilities strategies; define consultant/specialist or contractor‑designed packages; progress spatial co‑ordination, compliance and energy strategies; provide scheme, technical design and stage reports; support Employer’s Requirements and Building Contract preparation.

Post‑novation (Stages 5–7)

  • Visit site and manufacturers, supply further information, review contractor and sub‑contractor submissions, monitor quality, programme and change, and report monthly.
  • Witness tests, inspect for completion, manage snagging, issue as‑built drawings, operation and maintenance information, contribute to or produce the Health and Safety...
To view the latest version of this document and thousands of others like it, sign-in with LexisNexis or register for a free trial.
Web page updated on 22/05/2026

Popular documents

When evaluating a general damages claim, the practitioner ought initially to refer to the Judicial College Guidelines (JCG)...

Read More Right Arrow

This Practice Note This Practice Note reviews mechanisms used in settling litigation. A Tomlin order consists of a consent order paired with a schedule. It operates to stay proceedings on terms that have been agreed. The provisions contained in the schedule may remain confidential. This Practice Note describes the scope of confidentiality attaching to the schedule and sets out how it differs from a standard consent order. Sample wording for a Tomlin order is included, alongside links to precedents, as well as guidance on court approval. It also addresses varying, setting aside and enforcing a Tomlin order, including the considerations the court will take into account when handling applications for each. Further guidance is provided on interpreting and applying the relevant provisions of the CPR; however, some courts and divisions impose very specific requirements for both drafting and approval, and for approaching the schedule and confidentiality issues. Accordingly, you must consider the particular rules and court guide provisions in the forum where your claim is proceeding when drawing up the Tomlin order...

Read More Right Arrow

Date [ date ] Parties [ name of Landlord ] [ of OR incorporated in England and Wales (company registration number [ number ]) with its registered office at ] [ address ] (Landlord) [ name of Tenant ] [ of OR incorporated in England and Wales (company registration number [ number ]) with its registered office at ] [ address ] (Tenant) [ [ name of Guarantor ] [ of OR incorporated in England and Wales (company registration number [ number ]) with its registered office at ] [ address ] (Guarantor) ] [ [ name of Mortgagee ] [ of OR incorporated in England and Wales (company registration number [ number ]) with its registered office at ] [ address ] (Mortgagee) ] Definitions Within this Deed, the terms below shall be interpreted as follows: [ Annual Rent • the annual sum reserved under the Lease; ] [ Insurance Rent • the Tenant’s share of the Landlord’s costs of insuring the Property (as set out in the Lease); ] Lease • the lease of the Property dated [ date ], entered into between (1) [ the Landlord OR [ name ...

Read More Right Arrow

I, [ name ], of [ address ], solemnly and sincerely state that: [ Matters to be verified, set out in numbered paragraphs ] I make this solemn statement in good conscience, believing it to be true, and pursuant to the provisions of the Statutory Declarations Act 1835. DECLARED at [ details ] this [ day ] day of [ month and year ] Before me ................................................................................ [ signature of the person before whom the declaration is made ] A [ commissioner for oaths OR [ solicitor OR [ insert other qualification ] ] authorised to administer oaths ]...

Read More Right Arrow